MBTA Commuter Rail

Dari Wikipedia bahasa Indonesia, ensiklopedia bebas

MBTA Commuter Rail
Lokomotif diesel dengan kereta penumpang di sebuah stasiun
Info
PemilikMassachusetts Bay Transportation Authority (MBTA)
WilayahMassachusetts timur dan Pulau Rhode tengah
Jeniskereta Kommuter
Jumlah jalur13
Jumlah stasiun134 aktif; 9 ditutup
Penumpang tahunanTemplat:American transit ridership (Templat:American transit ridership)Templat:American transit ridership
Situs webmbta.com/schedules/commuter-rail
Operasi
Dimulai
  • 1834 (line pertama dibuka)
  • 1965 (awal subsidi MBTA)
  • 1973 dan 1976 (pembelian aset MBTA)
  • 1977 (konsolidasi penuh)
OperatorKeolis Commuter Services
Markah laporanMBTX
Jumlah gerbong110 lokomotif diesel, 475 kereta
Teknis
Panjang sistem394 mi (634 km)
Lebar sepur4 ft 8+12 in (1.435 mm) sepur standar
Kecepatan tertinggi79 mph (127 km/h)
peta sistem MBTA Commuter Rail


The MBTA Commuter Rail (markah laporan MBTX) system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

In Templat:American transit ridership, the system had a ridership of Templat:American transit ridership, or about Templat:American transit ridership per weekday as of Templat:American transit ridership, making it the fifth-busiest commuter rail system in the U.S., behind the three New York-area systems and the Chicago-area system. The line's characteristic purple-trimmed coaches operate as far south as North Kingstown, Rhode Island, and as far north as Newburyport and as far west as Fitchburg, both in Massachusetts.

Trains originate at two major terminals in BostonSouth Station and North Station. The only connection between the two halves of the system is the non-revenue Grand Junction Branch. The North–South Rail Link is a proposed tunnel between North Station and South Station to allow through-running service.

Service[sunting | sunting sumber]

Lines[sunting | sunting sumber]

The system consists of twelve lines – four of which have branches – radiating from downtown Boston. Eight "southside" lines terminate at South Station, with four (Framingham/Worcester, Needham, Franklin/Foxboro, and Providence/Stoughton) also running through Back Bay station. Four "northside" lines terminate at North Station. The Kingston Line and Middleborough/Lakeville Line are often grouped together as the Old Colony Lines. The lines vary in length from the 92-mile[convert: unit tak dikenal] Fairmount Line to the 629-mile[convert: unit tak dikenal] Providence/Stoughton Line, with typical lengths in the 25–40-mile[convert: unit tak dikenal] range.[1] The system has 394 mil (630 km) of revenue trackage and covers roughly the eastern third of Massachusetts plus central Rhode Island.[1][2]

Line Boston terminal Outer terminal(s) Stations[3] Length[1] Daily boardings
(October 2022)[4]
Greenbush Line South Station (Batak Simalungun) 10 276 mil (444 km) 2,691
Kingston Line South Station (Batak Simalungun)
(Batak Simalungun) (indefinitely closed)
11 (1 closed) 351 mil (565 km) – Kingston
356 mil (573 km) – Plymouth
4,171
Middleborough/Lakeville Line South Station (Batak Simalungun) 10 356 mil (573 km) 5,261
Fairmount Line South Station (Batak Simalungun) 9 92 mil (148 km) 2,843
Providence/Stoughton Line South Station (Batak Simalungun)
(Batak Simalungun)
16 (1 closed) 629 mil (1.012 km) – Wickford Junction
189 mil (304 km) – Stoughton
17,648
Franklin/Foxboro Line South Station (Batak Simalungun)
(Batak Simalungun)
18 (1 closed) 303 mil (488 km) – Forge Park/495
226 mil (364 km) – Foxboro
8,771
Needham Line South Station (Batak Simalungun) 12 137 mil (220 km) 4,881
Framingham/Worcester Line South Station (Batak Simalungun) 18 442 mil (711 km) 10,606
Fitchburg Line North Station (Batak Simalungun) 19 (2 closed) 537 mil (864 km) 4,829
Lowell Line North Station (Batak Simalungun) 9 (2 closed) 255 mil (410 km) 6,485
Haverhill Line North Station (Batak Simalungun) 15 329 mil (529 km) 5,806
Newburyport/Rockport Line North Station (Batak Simalungun)
(Batak Simalungun)
19 (2 closed) 362 mil (583 km) – Newburyport
353 mil (568 km) – Rockport
11,333

Most lines do not share trackage outside the Boston terminal areas, with several exceptions. The Providence/Stoughton Line and Franklin/Foxboro Line both use the Northeast Corridor between (Batak Simalungun) and South Station, with the Needham Line also sharing the tracks between (Batak Simalungun) and South Station. The Old Colony Lines and the Greenbush Line all use the Old Colony mainline between South Station and (Batak Simalungun). The Haverhill Line and Newburyport/Rockport Line share tracks between North Station and near (Batak Simalungun).[1] A small number of Haverhill Line trains use the inner Lowell Line and the Wildcat Branch, while a small number of Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor. Several Amtrak intercity routes run on MBTA tracks: the Acela and Northeast Regional over the Providence/Stoughton Line, the Lake Shore Limited over the Framingham/Worcester Line, and the Downeaster over portions of the Lowell and Haverhill lines.[3] Private companies also operate freight service over much of the system (see § Freight service).

Stations[sunting | sunting sumber]

A train at (Batak Simalungun) – a typical suburban station with a full-length high-level platform

Hingga January 2023, there are 134 active stations – 53 northside and 81 southside. Six additional stations ((Batak Simalungun), (Batak Simalungun), (Batak Simalungun), (Batak Simalungun), (Batak Simalungun), and (Batak Simalungun)) are indefinitely closed due to service cuts during the COVID-19 pandemic. Three stations ((Batak Simalungun), (Batak Simalungun), and (Batak Simalungun)) are temporarily closed due to structural deterioration.[3] Six additional stations are under construction as part of the South Coast Rail project; several other stations are planned. South Station, North Station, and Back Bay all have MBTA subway and Amtrak connections; nine other stations have subway connections, and six others have Amtrak connections.[3]

Stations range in size from small platforms like (Batak Simalungun) to the sprawling downtown terminals. Most stations outside downtown Boston have one or two side platforms or a single island platform.[5] Standard MBTA platforms are about 800 feet[convert: unit tak dikenal] long – enough for a nine-car train – and a minimum of 12 feet[convert: unit tak dikenal] wide for side platforms and 22 feet[convert: unit tak dikenal] wide for island platforms.[6][7] 108 active stations are accessible, including all terminals and all stations with rapid transit connections; 26 are not.[3] The MBTA uses 48-inci (1.200 mm)-high platforms for accessible level boarding, as is standard in the northeastern United States.[6][7] Some accessible stations have full-length high platforms for accessible boarding on all cars; others only have "mini-high" platforms about 40 feet[convert: unit tak dikenal] long – which allow for level boarding on two cars – with the rest of the platform length not accessible.[8][9] Hingga December 2022, the MBTA is designing a temporary accessible platform that can be added to stations pending full reconstructions.[10]

Operations[sunting | sunting sumber]

The MBTA Commuter Rail system is operated by Keolis Commuter Services – a subsidiary of French company Keolis – under contract to the MBTA.[11] The MBTA owns all passenger equipment and most stations.[12] Most trackage is also owned by the MBTA. The Massachusetts Department of Transportation (parent agency of the MBTA) owns several portions of the Framingham/Worcester Line as well as the Grand Junction Branch, which is used for non-revenue equipment moves between the northside and southside lines. Pan Am Southern owns the section of the Fitchburg Line between (Batak Simalungun) and Wachusett, while Amtrak owns the section of the Northeast Corridor (used by the Providence/Stoughton Line) in Rhode Island.[13]:21

Most lines operate on regular headways, though some have additional service at peak hours. Service levels vary by lines: the Greenbush and Kingston lines have 13 round trips on weekdays, while the Providence/Stoughton Line has 36.[3] Running times vary from 30 minutes on the Fairmount Line to nearly 120 minutes for some Providence/Stoughton Line trips, with 60–75 minutes typical.[3] Most trains stop at all stations on the line; some peak-hour express trains operate on the Framingham/Worcester and Providence/Stoughton lines. Several lines additionally have some short turn service.[3] The CapeFlyer, a seasonal weekend-only service to Cape Cod, operates using MBTA equipment over the Middleborough/Lakeville Line plus the Cape Main Line (which is not otherwise used by the MBTA). Special express service to Foxboro station is operated during New England Patriots home games and some other events at Gillette Stadium. It runs from South Station via the Franklin Line, and from Providence via the Providence/Stoughton Line. During the winter, one "ski train" round trip of the Fitchburg Line operates with a bicycle car on weekends and Wednesday evenings, with a shuttle bus to Wachusett Mountain.[14][15]

All MBTA commuter rail service is provided by push-pull trains powered by diesel locomotives (see § Rolling stock). Maximum speed for trains is 79 mil per jam (127 km/h), though some lines have lower limits.[16] The entire system is signalled and operates with Positive Train Control using the Advanced Civil Speed Enforcement System. The southside lines have cab signals for automatic train control; cab signals will be placed in service on the northside lines in 2023.[2] The MBTA is a member of the Northeast Operating Rules Advisory Committee (NORAC) and uses its operating rules. Most portions of the system operate under NORAC rules 261 and 562, which allow bidirectional train movements on every track (such as an express train passing a local train in the same direction). Portions of the Fitchburg, Haverhill, and Newburyport/Rockport lines operate under NORAC rule 251, which allow trains to run only in a single direction on each track.[17] Most lines are either double track, or single track with passing sidings; portions of the Northeast Corridor have three or four tracks.[5]

Freight service[sunting | sunting sumber]

A CSX freight train at Readville station

Freight service is operated over most of the MBTA Commuter Rail system by several private railroads. CSX Transportation operates freight on most southside lines, of which the outer portion of the Worcester Line has the most freight traffic. Massachusetts Coastal Railroad operates south of Middleborough on the Middleborough/Lakeville Line, as well as on future South Coast Rail trackage. The Fore River Railroad operates between Braintree Yard and East Braintree on the Old Colony mainline and the Greenbush Line. The Providence and Worcester Railroad shares tracks with Providence/Stoughton Line trains between Providence and Wickford Junction; it uses a freight-only track between Providence and Central Falls.[18][19] No freight operates on the Needham Line, the Northeast Corridor between Readville and Back Bay, the Old Colony mainline between Boston and the Greenbush Line junction in Braintree, the Plymouth/Kingston Line, and most of the Greenbush Line.[13]

CSX also operates on most northside lines; prior to its 2022 purchase by CSX, Pan Am Railways operated over these lines. Pan Am Southern (planned to be replaced by the Berkshire and Eastern Railroad) operates over the Fitchburg Line west of Ayer. Their combined Freight Main Line between Mechanicville, New York, and Mattawamkeag, Maine, shares tracks with sections of the Fitchburg, Lowell, and Haverhill lines. No freight service is operated over the Newburyport/Rockport Line north of Salem.[13]

Weight limits and loading gauge vary across the system. The full Framingham/Worcester line is rated for car weights of 315.000 pon (143.000 kg), sections of lines that are part of the Freight Main Line for 286.000 pon (130.000 kg), and other lines for lower weights. The western portion of the Framingham/Worcester Line and the southern section of the Providence/Stoughton line can accommodate cars up to 20 kaki 8 inci (6,30 m) (AAR Plate H or Plate K). The Fitchburg Line west of Ayer can accommodate cars up to 19 kaki 0 inci (5,79 m) (AAR Plate J), while most of the other northside lines can accommodate up to 17 kaki 0 inci (5,18 m) (AAR Plate F). The inner Fitchburg and Newburyport/Rockport Lines, and the southside except for the outer Framingham/Worcester Line, have height restrictions smaller than Plate F.[13]

Fares[sunting | sunting sumber]

Commuter Rail tickets in the form of CharlieTickets purchased at fare vending machines and ticket booths (left) and paper tickets purchased on-board (right).

MBTA Commuter Rail uses a zone fare system, with fares increasing with distance. Zone 1A includes the downtown terminals and other inner core stations up to about 5 mil (8,0 km) from downtown. Ten additional zones, numbered 1 through 10, extend outwards from Boston. Each zone is about 5 miles, with most outer terminals in zones 6 through 8. Only two stations use further zones: (Batak Simalungun) in Zone 9, and (Batak Simalungun) in Zone 10. Zone 1A fares are identical to MBTA subway fares (though subway passes on CharlieCards are not accepted, except for Fairmount Line stations that have CharlieCard validator machines). Hingga 2022, one-way fares within Zone 1A are $2.40, while fares between further zones and Zone 1A range from $6.50 for Zone 1 to $13.25 for Zone 10. Trips that do not enter Zone 1A have less expensive interzone fares; hingga 2022, these range from $2.75 for travel within a single zone to $7.25 for travel between Zone 1 and Zone 10.[20]

Fares can be purchased on the MBTA mTicket app, at automatic vending machines located at major stations, from businesses near some stations, or from conductors on board trains. Discounted passes include monthly passes (with or without free transfer to other MBTA services), "flex passes" valid for five 24-hour periods, and $10 passes offering unlimited travel on a single weekend.[21] As with other MBTA services, discounted fares and passes are available for several groups including disabled passengers, passengers over age 65, and students attending certain schools.[22] Foxboro special event services and the CapeFlyer have separate fares; regular MBTA fares and passes are not valid.[20] Fares are collected by train conductors; while fare evasion is explicitly illegal under state law, it is not criminal.[23] Faregates have also been installed at North Station, with plans for installation at Back Bay and South Station.[24] The second-generation MBTA fare collection system, planned for completion in 2024, will standardize fare media across modes and allow uses of CharlieCards for all commuter rail trips.[25]

History[sunting | sunting sumber]

Early history[sunting | sunting sumber]

A train at West Newton on the B&W in 1834

Eight intercity mainlines radiating from Boston opened between 1834 and 1855: the Boston and Worcester Railroad (B&W) in 1834–35, Boston and Providence Railroad (B&P) in 1834–35, Boston and Lowell Railroad (B&L) in 1835, Eastern Railroad in 1838–1840, Fitchburg Railroad in 1843–45, Boston and Maine Railroad (B&M) in 1845, Old Colony Railroad and Fall River Railroad in 1845–46, and Norfolk County Railroad in 1849–55. Commuter rail service allowing suburban residents to work in Boston began with the B&W in 1834; by the 1860s, commuting was possible on the eight mainlines and a number of branch lines.[26]:8 Mergers prior to the 1880s were primarily acquisitions of branch lines and consolidations with connecting lines: the B&A merged with the Western Railroad in 1874 to become the Boston and Albany Railroad (B&A), the Fall River Railroad and several other lines merged into the Old Colony Railroad, and the Norfolk County Railroad eventually became part of the New York and New England Railroad (NY&NE). The narrow gauge Boston, Revere Beach and Lynn Railroad (BRB&L) opened in 1875, competing with the inner portion of the Eastern Railroad. Unlike the other lines, it never built rails into downtown Boston, and instead relied on a ferry connection from East Boston.[27]:12

The B&M obtained control of the Eastern in 1883, the B&L in 1887, and the Fitchburg in 1900, giving it a near-monopoly on rail service north of Boston. North Union Station was built in 1893 to provide a union station for northside service; it was replaced by North Station in 1928. The Old Colony obtained control of the B&P in 1888; the New York, New Haven and Hartford Railroad acquired the Old Colony in 1893 to obtain access to Boston. The New Haven also acquired the New England Railroad (successor to the NY&NE) in 1898. South Station opened in 1899 as a union station for the southside lines (New Haven and B&A). The New York Central and Hudson River Railroad – which later became the New York Central) (NYC) – leased the B&A in 1900; this brought all Boston commuter service save the BRB&L under the control of three large multi-state railroads.[26]:9

See caption.
See caption.
Suburban railroads around Boston in 1912

The three railroads all planned electrification of some suburban lines in the early 20th century. The New Haven tested electrification on small parts of the Old Colony system, but never followed through on its plans to electrify South Station and the inner section of the ex-B&P.[27]:4 Despite a study to electrify the mainline to (Batak Simalungun) plus the Highland branch, the NYC only electrified the short Lower Falls Branch. Quadruple-tracking and electrification of part of the ex-Eastern Railroad was planned by the B&M around 1910 when it was briefly under control of the New Haven, but this fell through when they separated.[27]:4 Service levels on the three major railroads peaked around 1910 and began to decline from streetcar and later auto competition in the 1910s.[26]:11 The independent BRB&L electrified its mainline and single branch line in 1928 and increased service to near-rapid transit levels. Two Old Colony branches were converted to an extension of Boston Elevated Railway (BERy) rapid transit in the 1920s.[27]:5

Service levels declined more significantly during the 1930s; the 88 stations case resulted in the New Haven closing dozens of suburban stations and several lines in 1938. The BRB&L ceased all operations in 1940. Ridership increased during World War II but decreased soon afterwards, prompting further cuts. The railroads converted from steam to diesel in the 1950s. All three purchased substantial fleets of Budd Rail Diesel Cars, which lowered operating costs – but not enough to save most branch lines.[26]:13 A 1945–47 state report proposed suburban extensions of the rapid transit system, largely using railroad rights-of-way, with the expectation that most commuter rail service would be cut back to the rapid transit terminals or abandoned entirely. Prompted by the report, part of the BRB&L was reactivated as rapid transit in 1952–54 by BERy successor Metropolitan Transit Authority (MTA), and the Highland branch was converted to a rapid streetcar line in 1958–59.[28][27]:5

Consolidation under MBTA control[sunting | sunting sumber]

The three railroads all made major cuts to suburban service in 1958–1960 as commuters began using new expressways. The B&M became unprofitable in 1958 and moved to shed its money-losing passenger operations.[26]:15 Four branch lines were cut that May, and most stations in the MTA service area were closed; three more branches closed in 1959.[26] The New Haven experimentally increased Old Colony Division service for several years in the 1950s, but new management soon sought to reduce costs.[26]:13 Service to (Batak Simalungun) and (Batak Simalungun) was cut in 1958; a one-year state subsidy was given for the remaining Old Colony service, which ended in 1959 after the Southeast Expressway opened.[26]:14 The inner portion of the B&A was reduced from four to two tracks in 1959 for construction of the Massachusetts Turnpike, with several inner stations closed; all local stops west of Framingham were closed in 1960.[26]:24 The New Haven filed for bankruptcy for the last time in 1961. Faced with the imminent threat of losing what service remained, public opinion began to support subsidies for commuter rail.[26]:15

The state Mass Transportation Commission (MTC), formed in 1959 to coordinate transportation and land use, held a series of experiments to determine how fares and service levels affected ridership. This included a trial on the MTA bus network, as well as a $4 million test from January 1963 to March 1964 on New Haven and B&M lines. (The NYC, uninterested in its commuter service, declined to participate.) The MTC found that higher frequency was most important to attract additional ridership; lower fares would attract additional riders, while even higher fares would not result in the services becoming profitable. At the recommendation of the MTC, the Massachusetts Bay Transportation Authority (MBTA) was created on August 3, 1964, with a 78-municipality funding and service district. The MBTA was to build rapid transit extensions (as planned in 1947) along some lines, with the others to be subsidized or allowed to be discontinued. Most remaining lines ran to points outside the funding district; those outlying municipalities were expected to reach their own subsidy agreements with the railroads.[26]:15

B&M train at Lowell in 1969

On December 14, 1964, the MBTA reached a subsidy agreement with the B&M. The agreement only covered in-district services; on January 5, 1965, the B&M discontinued interstate service except for single commuter round trips from Dover and Concord, New Hampshire; Portsmouth service was cut back to a single (Batak Simalungun) round trip. Subsidies began for six lines on January 18; all out-of-district service to (Batak Simalungun), (Batak Simalungun), (Batak Simalungun), (Batak Simalungun), and (Batak Simalungun) was discontinued except for three single round trips.[28] Agreements were reached to restore most out-of-district service; after delays due to a lawsuit by the competing Eastern Massachusetts Street Railway, full service returned to (Batak Simalungun), Lowell, Ipswich, and Rockport on June 28.[28][27]:10 On June 30, 1967, the B&M discontinued the Concord trip; the Dover trip was cut back to Haverhill with local subsidies.[28] In 1969, the B&M averaged 24,000 weekday passengers, with a yearly deficit of $3.2 million (equivalent to 219 million in 2022).[29] The single daily trip on the Central Mass Branch ended on January 26, 1971.[28]

New Haven train at Franklin in 1968

On July 28, 1965, the MBTA signed an agreement with the New Haven Railroad to purchase 11 mil (18 km) of the former Old Colony mainline from Fort Point Channel to South Braintree in order to construct a new rapid transit line along the corridor. The line was expected to be completed within two years. The agreement also provided for the MBTA to subsidize commuter service on the railroad's remaining commuter rail lines for $1.2 million (equivalent to 82 million in 2022) annually.[28][30] Subsidies for the Needham, Millis, Dedham, and Franklin lines began on April 24, 1966, as the New Haven had Interstate Commerce Commission (ICC) permission to discontinue them otherwise. Three out-of-district stations were cut, while Franklin subsidized its station. The Millis and Dedham lines were discontinued on April 21, 1967.[28][26]:16 The NYC and the Pennsylvania Railroad merged to form Penn Central on February 1, 1968; the New Haven joined at the end of the year. Penn Central declared bankruptcy in 1970.[28][31] Amtrak took over most intercity passenger service in the US on May 1, 1971, including New York–Boston trains.[28]

The state agreed in December 1971 to purchase 145 mil (233 km) of Penn Central rights of way to prevent them being sold off in bankruptcy. The MBTA purchased the lines effective January 27, 1973. They included almost all the lines with passenger service: the Attleboro Line and Stoughton Branch, Franklin Branch, Needham Branch, and the (Batak Simalungun)–Framingham portion of the Worcester Main Line. (The inner section of that line was already owned by the Massachusetts Turnpike Authority.) The purchase also included several freight-only or abandoned lines, including the Old Colony mainline between Braintree and Brockton.[28][26]:16 Subsidies began for the Framingham Line in January 1973, for (Batak Simalungun) and (Batak Simalungun) stations in June 1973, and all Providence/Stoughton Line service on September 28, 1976.[28] The MBTA purchased the B&M Western Route between Somerville and Wilmington Junction in September 1973 for construction of the Haymarket North Extension

From 1967 to 1973, a series of state appropriations covered 90–100% of outside-of-district subsidy. This was reduced to 50% in January 1974, substantially increasing the cost of these municipalities.[26]:16 This resulted in several cuts as municipalities refused the higher subsidies: Ayer service was cut to (Batak Simalungun) on March 1, 1975; the single Newburyport trip ended on April 1, 1976; and the single Haverhill trip ended on April 2, 1976 (North Andover and Andover having previously ended subsidies.) The single round trip to (Batak Simalungun), never subsidized, was cut to Framingham on October 27, 1975.[28] Amtrak began running the Lake Shore Limited over that route four days later, restoring rail service to Worcester.[32] State subsidies were increased back to 75% in June 1976 to prevent further cuts.[26]:16

Combined operations[sunting | sunting sumber]

1974 map showing a unified commuter rail system with new purple coloring

Rapid transit extension was slower than expected; by 1971, the only extension in service was the first portion of the Red Line Braintree Branch on the Old Colony mainline.[28] In 1972, as part of a funding shift from highways to transit, Governor Francis Sargent initiated a Commuter Rail Improvement Program.[26]:16 On October 8, 1974, the MBTA began using purple to represent the commuter rail system, as had been done in 1965 with the rapid transit lines. MBTA maps began showing the B&M and Penn Central lines as a single system.[28] Penn Central became Conrail on April 1, 1976; the MBTA purchased most of their commuter rolling stock at that time.[28] After delays due to the B&M bankruptcy, the MBTA purchased the B&M commuter equipment, maintenance facility, and 250 mil (400 km) of right of way on December 27, 1976. This included all lines with passenger service, as well as a number of freight-only or abandoned lines. This also marked the start of a five-year contract for the B&M to operate the service, replacing a series of one-year contracts.[28][26]:16 After acquiring the B&M and Penn Central rolling stock, the MBTA painted it with purple, yellow, silver, and black to create a visual identity.[33]

Federal subsidies allowed MBTA subsidies to Penn Central to remain the same until March 1977, when a large increase was expected. Since it owned the tracks and equipment, the MBTA bid out the operating contract, which was won by the B&M. The B&M began operating the southside lines on March 15, 1977; for the first time, all Boston commuter service was operated by one entity.[26]:16 Although all operation was subsidized by this time, a small number of cuts took place. The lightly used Lexington Branch closed after a snowstorm on January 10, 1977. Declining subsidies from Rhode Island resulted in off-peak (Batak Simalungun) service being cut back to (Batak Simalungun) in April 1979, with peak service cut on February 20, 1981. Woburn Branch service ended on January 30, 1981, amid state budget cuts.[28]

However, the energy crises of the 1970s and the formation of regional transit authorities prompted some expansions and improvements. $70 million in reconstruction work (equivalent to 478 million in 2022) on the Franklin Line and several northside lines, partially funded by the Urban Mass Transportation Administration, began in 1977 under the Commuter Rail Improvement Program.[26][34] Service to Haverhill resumed on December 17, 1979, and to (Batak Simalungun) and (Batak Simalungun) on January 13, 1980. Federally-funded experimental service to Nashua, Manchester, and Concord, New Hampshire ran from January 28, 1980, to March 1, 1981.[28] Little-used stations continued to be closed until the 1980s, but several infill stations were opened, including (Batak Simalungun) in 1981, (Batak Simalungun) in 1982, (Batak Simalungun) in 1984, and (Batak Simalungun) in 1985.[28] The MBTA also began replacing the aging Rail Diesel Cars and other equipment; 18 EMD F40PH diesel locomotives and 60 passenger cars arrived between 1978 and 1980.[12]

A train of new equipment on the recently upgraded Franklin Line in 1980

Several major disruptions occurred in the mid-1980s. On January 20, 1984, a fire destroyed the wooden approach trestles to the North Station drawbridges. The four northside lines used temporary terminals with rapid transit connections while the trestles were rebuilt.[35] Another bridge fire between Beverly and Salem on November 16, 1984, isolated part of the Ipswich/Rockport Line from the rest of the system.[28] Service to North Station resumed on April 20, 1985; service to Ipswich and Rockport resumed on December 1, 1985.[36][28]

Guilford Transportation Industries purchased the B&M in 1983. This did not initially affect commuter rail operations.[33] Guilford's attempts to regain profitability, which included reducing employee headcount and pay, soon soured labor relations. This resulted in two strikes by Guilford employees; the first shut down the commuter rail system from March 21 to May 12, 1986. Local media was critical of Guilford during the strike; the company did not bid for a renewal of the commuter rail operating contract, which expired at the end of 1986.[33] Amtrak won the contract for commuter rail operations and took over the system on January 1, 1987. Gardner service was cut back to Fitchburg at that time due to a dispute between Amtrak, Guilford, and the MBTA.[28]

Expansions[sunting | sunting sumber]

The late 1980s saw the beginning of substantial expansion of the system. The Southwest Corridor project was completed in 1987 with a new below-ground alignment for commuter rail, Amtrak, and Orange Line trains. Back Bay and (Batak Simalungun) stations were completely rebuilt as transfer stations, and (Batak Simalungun) opened to serve the growing Longwood Medical Area. The Needham Line, closed since 1979 for construction, was reopened. The Attleboro and Franklin lines had been diverted over the previously freight-only Dorchester Branch during construction; after they returned to the Southwest Corridor, a shuttle service was retained as the Fairmount Line.[28] Peak-hour service to Providence resumed in 1988 (with off-peak and weekend service later added); (Batak Simalungun) was added in 1990 as a park-and-ride station to replace (Batak Simalungun).[28][37] The Franklin Line was extended to (Batak Simalungun) in 1988; infill stations in that era included (Batak Simalungun) in 1988 to serve Boston Red Sox games at Fenway Park, and (Batak Simalungun) in 1990.[28]

Massachusetts had state accessibility laws since 1977 – prior to 1990 federal legislation. At times, the MBTA clashed with state regulators: several stations including West Natick and Chelsea were built without accessible platforms despite state rules; the latter resulted in fines from the Massachusetts Architectural Access Board (MAAB).[38][39][40] The opening of South Attleboro was delayed by the MAAB because of the MBTA's refusal to build full-length high-level platforms.[39] However, the MBTA did slowly increase accessibility of the system. Most Ipswich/Rockport line stations were made accessible during the 1984–85 closure, and renovations followed at other stations.[41] South Station was made accessible in the late 1980s, Back Bay during the Southwest Corridor project, and North Station in the early 1990s, providing accessibility at the main downtown Boston stations.[39] By 1992, 44 commuter rail stations were accessible.[42]

In 1991, the state agreed to build a set of transit projects as part of the settlement of a lawsuit by the Conservation Law Foundation (CLF) over auto emissions from the Central Artery/Tunnel Project (Big Dig). Among these project were extensions of the Framingham Line to Worcester and the Ipswich/Rockport Line to Newburyport, restoration of the Old Colony Lines, and addition of 20,000 park and ride spaces outside the urban core.[43] Peak-hour service to Worcester began in 1994, followed by off-peak and weekend service; four intermediate stations were added in 2000 and 2002. Service on the Old Colony Lines (Middleborough/Lakeville Line and Kingston/Plymouth Line) began in 1997. (Batak Simalungun) and (Batak Simalungun) opened in 1998.[28] The MBTA Commuter Rail Maintenance Facility, which replaced the ex-B&M Boston Engine Terminal, was completed in 1998.[44]

Two tenders were submitted in 2003, one from GTI and another from the newly formed Massachusetts Bay Commuter Railroad Company (MBCR), a partnership between Connex (later Veolia), Bombardier Transportation and Alternate Concepts, Inc. MBCR won the contract, and took over the MBTA Commuter Rail operation from Amtrak in July 2003. The MBCR contract originally expired in July 2008 but had an additional five-year option; it was later extended three years to July 2011 and then another two to July 2013.[45][46] After concerns about on-time performance, the 2011 extension increased the fine for late trains from $100 to $300.[47] The MBTA considered running the service directly rather than contracting it out, but this "public option" was rejected in 2012.[48] In August 2012, MBCR and Keolis were the two bidders for the contract. On January 8, 2014, the MBTA awarded Keolis the contract for $2.68 billion over eight years, with the possibility of two two-year extensions that could bring the total price to $4.3 billion.[49] Keolis took over the operations on July 1, 2014. Keolis lost $29.3 million in its first year of operation.[50] In June 2020, the MBTA extended the contract through at least 2025.[51]

Free Wi-Fi internet service was piloted in January 2008 on the Worcester Line, where 45 coaches were fitted with routers which connected to cellular data networks. This was the first Wi-Fi available on a commuter rail service in the United States.[52] The program was considered successful; in December 2008, the MBTA announced that Wi-Fi would be available on all trains by mid-2009.[53] In July 2014, the MBTA announced that a private company would be building a new network by 2016 to replace the 2008-built network. The MBTA would not pay for the new network; the company would have a two-tier model with a fee for higher bandwidth.[54][55] The MBTA canceled the plan in August 2017 due to local opposition to the erection of 320 monopoles, each 70-feet[convert: unit tak dikenal] tall, as well as the need to focus on more critical projects like the Green Line Extension.[56] By that time, the 2008-built system was largely unusable to the decommissioning of 3G networks.[57]

Positive Train Control was implemented on the entire system per a federal mandate, which required installation by the end of 2018 with the possibility of a two-year extension. Construction began in 2017.[2] The final segment of the system to have Positive Train Control activated was the inner Worcester Line on August 15, 2020.[58] Most of the southside lines already had cab signals for automatic train control (ATC) prior to PTC implementation, but the northside lines did not.[17] Cab signals on the southside were completed in 2020; cab signals on the northside will be completed in 2023.[2] Temporary bus replacements for several lines took place between 2017 and 2022 during PTC and ATC construction and testing.[28]

  • The Greenbush Line opened in 2007.[28]
  • The Riverside-Framingham section was sold to the MBTA in 1976 as part of their larger acquisition of PC commuter assets, but the section past Framingham remained in Conrail control.[28] In September 2009, Conrail successor CSX Transportation and the Commonwealth finalized a US$100.000.000 ($116.783.000 tahun 2024) agreement to purchase CSX's Framingham to Worcester tracks, as well as the Grand Junction Railroad plus lines which will be part of the South Coast Rail project, to improve service on the Framingham/Worcester Line.[59] After several years of construction and negotiations, ownership of the line was transferred to the commonwealth on October 4, 2012, with increased service on the outer section of the line beginning several weeks later.[28][60]
  • As Big Dig mitigation, MBTA rebuilt existing stations and is adding 4 new stations along the line.[61] The first of these, Talbot Avenue, opened on November 12, 2012, followed by Newmarket and Four Corners/Geneva on July 1, 2013.[62] Blue Hill Avenue station was opened on February 25, 2019, after many delays.
  • Service was extended further south to T. F. Green Airport in Warwick, Rhode Island in December 2010 and to Wickford Junction in North Kingston in April 2012.[63] This represents the first commuter service in Rhode Island south of Providence since 1981.[28]
  • In 2013, the CapeFLYER service began running from South Station to Hyannis on summer weekends – the first direct service from Boston to Cape Cod since 1959. Though officially a Cape Cod Regional Transit Authority service, the CapeFLYER uses MBTA equipment.[28]
  • A 4-mile extension of the Fitchburg Line to Wachusett station opened on September 30, 2016.[64]

COVID-19 pandemic[sunting | sunting sumber]

Weekday service was substantially cut on March 17, 2020, due to reduced ridership during the COVID-19 pandemic.[65] On June 22, service was increased to 85% of normal weekday levels.[66] Changes effective November 2 reduced peak service and increased off-peak service, providing more consistent midday headways on some lines; Foxboro pilot service was suspended.[67]

In November 2020, as part of service cuts during the pandemic, the MBTA proposed to close six low-ridership stations.[68] On December 14, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing five stations.[69][70] That day, temporary reduced schedules were again put into place, with four of the five stations ((Batak Simalungun), (Batak Simalungun), (Batak Simalungun), and (Batak Simalungun)) not served.[71]

On January 23, 2021, reduced schedules based on the December 14 vote went into place, with no weekend service on seven lines.[28][72] Service changes on April 5, 2021, increased midday service on most lines as part of a transition to a regional rail model.[73] Weekend service on the seven lines resumed on July 3, 2021.[74] Ridership dropped substantially during the COVID-19 pandemic, with daily boardings just 12,800 during the first quarter of 2021.[75] Ridership rose to 47,100 average weekday boardings in the first quarter of 2022, and 85,000 (69% of 2018 ridership) in October 2022.[76][4]

Rolling stock[sunting | sunting sumber]

Aerial view of the MBTA Commuter Rail Maintenance Facility

All MBTA commuter rail service is provided by push-pull trains powered by diesel locomotives with a cab car on the opposite end. The locomotive is usually on the end facing away from Boston so that diesel exhaust does not enter the passenger concourses at North Station and South Station. Trains typically have four to eight coaches (with six the most common) and seat between 400 and 1,400 passengers. Approximately 65 trainsets are needed for weekday service.[12]

The primary heavy maintenance facility is the MBTA Commuter Rail Maintenance Facility, located in the Inner Belt District in Somerville. It is also used for midday and overnight storage of trains on the northside lines. Southampton Street Yard and the Readville Interim Layover facility are used for light maintenance and layover service. Various other layover facilities are used for midday and overnight storage; most are located near the outer ends of the lines.[1] Some maintenance and storage of MBTA equipment is contracted out to the Seaview Transportation Company in North Kingstown, Rhode Island.[77]

Several additional yards are under construction or planned. Two layovers are under construction for South Coast Rail, with completion planned for late 2023, and the Haverhill Line layover at (Batak Simalungun) is proposed for relocation later in the 2020s.[78] A new midday layover yard at the former Beacon Park Yard is planned to be constructed by 2032 as part of the realignment of I-90.[79] A large midday and overnight layover yard, which would support expanded service including regional rail and electrification, is planned at Widett Circle near South Station.[80][81] The MBTA also plans to construct a southside maintenance and layover facility at (Batak Simalungun) in 2023–2028, replacing the existing layover yard there, as the Grand Junction Branch will be closed for several years during the I-90 project.[82]

Locomotive fleet[sunting | sunting sumber]

Hingga April 2023, the MBTA owned 110 locomotives. Of these, 86 were in active passenger service and two used for work service. Thirteen were undergoing rebuild, five awaiting repairs, and four retired and awaiting disposition. All passenger locomotives are equipped with head end power. Rebuilding of 37 F40PH-2C and F40PHM-2C locomotives to F40PH-3C class by MotivePower (MPI) began in 2017; other older locomotives are also being rebuilt by MPI or in-house.[12]

Year built[12] Builder[12] Model[12] Numbers[12] Number active[12] Notes[12] Image
1973–1975 GMD GP40MC 1115–1139 20 Originally built as GP40-2LW for Canadian National Railways; rebuilt by AMF for passenger service in 1997. Most are being rebuilt in-house.[12]
1987–1988 EMD F40PH-3C 1050–1075 18 Originally built as F40PH-2C. Rebuilt by MPI in 2001–2003, and again by MPI as F40PH-3C in 2019–Present.[12]
1991–1993 Morrison–Knudsen 1025–1036 6 Originally built as F40PHM-2C. Rebuilt by MPI in 2003–2004, and again by MPI as F40PH-3C in 2019–Present.[12]
2009 MPI MP36PH-3C 010-011 0 Purchased from Utah Transit Authority in 2011.[12][83] Being overhauled by MPI.[12]
2013–2014 MPI HSP46 2000–2039 40
2009 NRE NRE 3GS21B 3248–3249 0 Work locomotives – not used for passenger service[12]

Coach fleet[sunting | sunting sumber]

Hingga April 2023, the MBTA owned 479 coaches. Of these, 403 were in active service, seven being repaired or overhauled, 16 leased to the Connecticut Department of Transportation (ConnDOT) for use on the Hartford Line, and 53 pending disposition or reuse.[12] Coaches whose designations start with BTC (Blind Trailer Coach) are conventional coaches, while those starting with CTC (Control Trailer Coach) are cab cars. Coaches acquired before 1990 were single-level cars with 88 to 127 seats; those since are bilevel cars with 173 to 185 seats.[12] Some coaches are equipped with electronic doors for use on the Old Colony Lines and Greenbush Line, which have full-length high-level platforms at all stops. All BTC-3, CTC-3, BTC-4C, and BTC-4D coaches have restrooms.[12] During winter months, a Ski Train serving Wachusett Mountain runs on the Fitchburg Line, using a coach car which is equipped for carrying bicycles or skis.[12][84] Three converted coaches – a bike car and two cafe cars – are reserved for the CapeFLYER.[12]

The agency issued a $279 million contract (total project cost of $345 million) for 80 additional Rotem bilevel coaches in September 2019, with delivery expected from September 2022 to June 2024.[85] The contract was later modified to 83 coaches, of which 43 are cab cars.[12] The first four of the 83 bilevel cars arrived in June 2022; they entered service in 2023.[12][86] An additional procurement of 100 bilevel cars, to be delivered from 2024 to 2027, was postponed due to the COVID-19 pandemic.[85]

Year built[12] Builder[12] Model[12] Numbers[12] Number active[12] Seats[12] Notes Image
1978–79 Pullman BTC-1C 200–202, 204–214, 216–258 33 114 Rebuilt from BTC-1 and CTC-1 cars in 1995–1996. Coach 219 is a bike/ski car, 221 a bike car, and 224 and 225 café cars.[12]
1987 Bombardier BTC-1A 350–389 40 127
1987–88 MBB BTC-3 500–542 10 86 533–542 were converted from CTC-3 in 2019–2022. 12 coaches are leased to ConnDOT.[12]
CTC-3 1500–1533 2 96 Four coaches are leased to ConnDOT.[12]
1989–90 Bombardier BTC-1B 600–653 49 122
CTC-1B 1600–1652 51 122 Cab controllers have been deactivated in coaches 1600–1624; they are used exclusively as blind coaches.[12]
1990–91 Kawasaki BTC-4 700–749 50 185 All units were overhauled by Alstom in 2014–2019.[12]
CTC-4 1700–1724 23 175 All active units were overhauled by Alstom in 2014–2019.[12]
1997–1998 Kawasaki BTC-4A 750–766 17 182 All units were overhauled by Alstom in 2019–2021.[12]
2001–2002 Kawasaki BTC-4B 767–781 15 182 All units were overhauled by Alstom in 2019–2021.[12]
2005–2006 Kawasaki BTC-4C 900–932 33 178
2012–2014 Hyundai Rotem BTC-4D 800–846 46 179
CTC-5 1800–1827 26 173
2022–2024 Hyundai Rotem BTC-4D 847–886 4 179 Currently entering service.[12]
CTC-5 1828–1870 4 173 Currently entering service.[12]

Retired equipment[sunting | sunting sumber]

An EMD FP10 locomotive with rented GO Transit coaches at South Station in 1979

As the MBTA assumed control of the commuter rail during the 1970s, it inherited various equipment from predecessor railroads.[87] The 1976 purchase of B&M and Penn Central equipment included 94 Budd Rail Diesel Cars (RDCs) – 86 from the B&M and eight from Penn Central – plus 116 Penn Central coaches and 25 Penn Central E8 and GP9 diesel locomotives.[12] Although the MBTA purchased some new equipment in 1978–1980, large locomotive and coach fleets were not purchased until the late 1980s, so the first decade of combined operations used a variety of secondhand equipment in addition to that acquired in 1976:[87][12]

Most of the secondhand and inherited equipment was retired between 1979 and 1989. 33 ex-B&M RDCs were converted to locomotive-hauled coaches (designated BTC-2 and CTC-2) in 1980 and 1982; they were retired by 1989. This left all MBTA service operated by locomotives and coaches purchased new by the MBTA.[87][12] At several points since, the MBTA or its contract operator has temporarily leased locomotives when needed. Some passenger equipment acquired new by the MBTA has been retired:

Expansion projects[sunting | sunting sumber]

Regional rail and electrification[sunting | sunting sumber]

A diesel MBTA train on the electrified Northeast Corridor. The MBTA plans to pilot electric service between Boston and Providence.

The MBTA plans to convert the system from diesel-powered commuter rail – which is primarily designed for Boston-centric trips at peak hours – to an electric regional rail system with frequent all-day service. Initial steps were taken in fall 2020 when some peak service was moved to midday, and in April 2021 when 9 of the 15 lines were moved to clock-face scheduling. A previous attempt at regional rail was made in 2013–2014 with a procurement for diesel multiple units for the Fairmount Line, new Track 61 service, and several other lines with the new service being labeled as the Indigo Line.[88] The DMU procurement as well as the Indigo Line proposal was canceled in 2015.[89]

In 2021, the MBTA indicated plans to pilot electric multiple units on Providence service (on the Northeast Corridor, which is already electrified for Amtrak service) in 2024, with the Fairmount Line and the inner section of the Newburyport/Rockport Line electrified later in the decade.[90] Several preliminary projects, including planning for a new layover facility, are scheduled for fiscal years 2023 to 2027 – but not actual electrification.[91] By 2022, lawmakers and environmental advocacy groups had criticized recent MBTA proposals for not adhering to previously set rail initiatives.[92]

In June 2022, the MBTA indicated plans to purchase battery electric multiple units, with catenary for charging on part of the network. This is intended to reduce the amount of catenary installation required, avoid reconstructions of overhead bridges, and avoid poor existing power grids on some branch lines. Plans call for electric service on the Providence/Stoughton Line and Fairmount line by 2028–29, followed by the Newburyport/Rockport Line in 2031; all lines would be electrified by 2050. Pilot electric service between Boston and Providence would be possible after the late 2023 introduction of the Avelia Liberty freed up ACS-64 locomotives for use.[93] Funding for electrification of the Framingham/Worcester Line was included in a 2022 state bond bill.[94] Transit advocates have expressed concern that a hybrid service plan remains unproven for regional rail applications and could be more expensive to operate than full-build electrification; others have criticized that the MBTA's cost and construction projections for system-wide catenary installation were overestimated in comparison to similar project costs in Europe and North America.[95][96]

North–South Rail Link[sunting | sunting sumber]

No direct connection exists between the two downtown commuter rail terminals; passengers must use the MBTA subway or other modes to transfer between the two halves of the system. (For non-revenue transfers of equipment, the MBTA and Amtrak use the Grand Junction Branch.) The proposed North–South Rail Link would add a new rail tunnel under downtown Boston to allow through-running service, with new underground stations at South Station, North Station, and possibly a new Central Station. A feasibility study was conducted in 2018.[97]

South Coast Rail[sunting | sunting sumber]

Construction of Middleborough station for the South Coast Rail project in 2021

The South Coast Rail project is under construction to extend service to the South Coast cities of Taunton, Fall River, and New Bedford, which were last served by commuter service in 1958. A full planning process was held from 1990 until its suspension in 2002. Planning restarted in 2007, with environmental documentation completed in August 2013. Plans were modified into two phases in 2017 due to an increase in costs.[98] Phase I is under construction to run diesel service beginning in 2023 as an extension of the Middleborough/Lakeville Line via the Middleboro Secondary. Phase II, planned for 2030, would extend the Stoughton Branch of the Providence/Stoughton Line over a reactivated line with electric service.

Other extensions[sunting | sunting sumber]

Two extensions of existing lines have been studied in the 2020s:

  • Extension of the Middleborough/Lakeville Line to Buzzards Bay or Sagamore (both in Bourne) to serve Cape Cod was studied in 1997, and extension to Buzzards Bay was again studied in 2007.[99][100] The extension was again proposed after the 2013 introduction of the CapeFLYER. The town of Bourne voted in 2015 to join the MBTA district.[101] MassDOT mulai merencanakan kemungkinan layanan uji coba kereta komuter pada Oktober 2015.[102] Layanan yang diusulkan, yang memiliki kereta ulang-alik antara Bourne dan (Batak Simalungun) yang dioperasikan oleh Massachusetts Coastal Railroad, ditolak oleh Badan Pengelolaan dan Pengendalian Fiskal MBTA pada April 2016.[103] Stasiun Middleborough, yang akan menggantikan Middleborough/Lakeville pada tahun 2023 saat layanan South Coast Rail dimulai, dibangun dengan ruang untuk potensi platform masa depan untuk kereta antar-jemput.[104]:37 Studi tahun 2021 menganalisis dua alternatif untuk layanan ke Buzzards Bay atau stasiun Bourne. Layanan antar-jemput Middleborough–Buzzards Bay dengan 7 perjalanan pulang pergi harian diharapkan memiliki 1.710 total perjalanan harian, sementara layanan Middleborough–Bourne dengan 10 perjalanan pulang pergi harian (termasuk dua perjalanan pulang pergi Boston–Bourne di luar puncak) diharapkan memiliki 2.540 total perjalanan harian.[105]
  • Perpanjangan Jalur Lowell ke Manchester dan Nashua, New Hampshire telah diusulkan sejak layanan percontohan 1980–81.[106] Perpanjangan tersebut telah menjadi isu perdebatan politik di tingkat negara bagian di New Hampshire, dengan politisi Demokrat mendukung layanan tersebut dan politisi Republik menentangnya.[107] Analisis alternatif tahun 2014 merekomendasikan beberapa kemungkinan layanan, termasuk kereta api komuter ke Nashua atau Manchester atau kereta antarkota ke Concord, untuk evaluasi lebih lanjut.[108] Pekerjaan teknik dan desain untuk layanan komuter ke Manchester dimulai pada akhir 2020, dan selesai pada Februari 2023.[109]

Beberapa perluasan lain dari jalur yang ada dan pemulihan layanan ke jalur yang tidak digunakan telah dipelajari di masa lalu:

Stasiun pengisian[sunting | sunting sumber]

Reconstruction of Natick Center station in 2022

Beberapa stasiun pengisi di jalur yang ada sedang dibangun atau diusulkan:

Renovasi stasiun[sunting | sunting sumber]

Beberapa renovasi stasiun untuk aksesibilitas, perluasan layanan, dan/atau perbaikan sedang dalam pembangunan atau direncanakan:

  • Stasiun Natick Center sedang dibangun kembali untuk aksesibilitas, diharapkan selesai pada musim gugur 2024.[10]
  • Stasiun Winchester Center sedang dibangun kembali untuk aksesibilitas, diharapkan selesai pada April 2024. Stasiun ditutup sementara pada Januari 2021 karena kerusakan struktural.[10]
  • Platform kedua di Stasiun Worcester Union sedang dibangun, diharapkan selesai pada Februari 2024.[10]
  • Pekerjaan desain untuk rekonstruksi stasiun South Attleboro untuk aksesibilitas selesai pada April 2022, meskipun pekerjaan konstruksi belum didanai. Stasiun ditutup sementara pada Februari 2021 karena kerusakan struktural.[10]
  • Rekonstruksi (Batak Simalungun) untuk aksesibilitas direncanakan akan dimulai pada tahun 2023.[10]
  • Rekonstruksi (Batak Simalungun) direncanakan, dengan peron sementara diharapkan dibuka pada 2024. Stasiun ditutup sementara pada Oktober 2022 karena kerusakan struktural.[10]
  • Rekonstruksi (Batak Simalungun), (Batak Simalungun), dan (Batak Simalungun) untuk aksesibilitas dan peningkatan kapasitas telah direncanakan.[10]

Lihat Juga[sunting | sunting sumber]

References[sunting | sunting sumber]

  1. ^ a b c d e Templat:MBTA Bluebook 2014
  2. ^ a b c d "Commuter Rail Safety and Resiliency Program". Massachusetts Bay Transportation Authority. Diarsipkan dari versi asli tanggal November 3, 2022. 
  3. ^ a b c d e f g h "Schedules: Commuter Rail". Massachusetts Bay Transportation Authority. Diakses tanggal October 26, 2022. 
  4. ^ a b Poftak, Steve (October 27, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. hlm. 6. 
  5. ^ a b Held, Patrick R. (2010). "Massachusetts Bay Colony Railroad Track Charts" (PDF). Johns Hopkins Association for Computing Machinery. Diarsipkan dari versi asli (PDF) tanggal October 8, 2013. 
  6. ^ a b Jacobs (December 2015). "Winchester Center Station Renovation Project: 15% Preliminary Design Report". Massachusetts Bay Transportation Authority. hlm. 13. 
  7. ^ a b "Appendix 2". Context Review Technical Memorandum. North South Rail Link Feasibility Reassessment. Massachusetts Department of Transportation. January 18, 2018. 
  8. ^ Report to the House and Senate Authorizing Committees: Study of Methods to Improve or Correct Station Platform Gaps (PDF) (Laporan). Federal Transit Administration Office of Civil Rights. October 2010. hlm. 9. 
  9. ^ "Commuter Rail Access Guide". Massachusetts Bay Transportation Authority. Diakses tanggal November 4, 2022. 
  10. ^ a b c d e f g h "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. hlm. 6–8. 
  11. ^ "Keolis, MBTA Commuter Rail Operator, What We Do And Do Not Do". keoliscs.com. February 22, 2017. Diarsipkan dari versi asli tanggal December 3, 2020. 
  12. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax "The MBTA Vehicle Inventory Page". Boston Street Railway Association. Diakses tanggal April 5, 2023. 
  13. ^ a b c d "Massachusetts State Rail Plan" (PDF). Massachusetts Department of Transportation. January 2018. hlm. 31–43. 
  14. ^ "Special Service". Mass by Train. Massachusetts Bay Transportation Authority. Diarsipkan dari versi asli tanggal September 7, 2022. 
  15. ^ "Updated Schedule Released for Fitchburg Line: "Ski Train" Returns for the Season" (Siaran pers). Massachusetts Bay Transportation Authority. November 28, 2022. 
  16. ^ Luttrell, Aviva (September 18, 2019). "Electrified, faster and more trains; 7 ways TransitMatters says the MBTA's Commuter Rail Service could be a lot better". MassLive. Diakses tanggal November 8, 2022. 
  17. ^ a b "MBTA PTC Implementation Plan (PTCIP): Revision 11". Massachusetts Bay Transportation Authority. May 2017. hlm. 1-9. 
  18. ^ Hartley, Scott A. (April 2016). "The key to Providence & Worcester's success: Reinvention". Trains Magazine. hlm. 50–57. 
  19. ^ Rhode Island Department of Administration (March 13, 2014). "Rhode Island State Rail Plan 2014" (PDF). hlm. 74–75. Diakses tanggal October 18, 2022. 
  20. ^ a b "Commuter Rail Fare Zones". Massachusetts Bay Transportation Authority. Diakses tanggal November 9, 2022. 
  21. ^ "Commuter Rail Fares". Massachusetts Bay Transportation Authority. Diakses tanggal November 9, 2022. 
  22. ^ "Reduced Fares". Massachusetts Bay Transportation Authority. Diakses tanggal November 9, 2022. 
  23. ^ "Section 101: Evasion of payment of toll or fare". Massachusetts General Laws. Commonwealth of Massachusetts. 
  24. ^ "Commuter Rail to Begin Operating Fare Gates at North Station on October 1" (Siaran pers). Massachusetts Bay Transportation Authority. September 23, 2022. 
  25. ^ "Fare Transformation". Massachusetts Bay Transportation Authority. Diakses tanggal November 9, 2022. 
  26. ^ a b c d e f g h i j k l m n o p q r s Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. ISBN 9780685412947. 
  27. ^ a b c d e f Humphrey, Thomas J.; Clark, Norton D. (1986). Boston's Commuter Rail: Second Section. Boston Street Railway Association. ISBN 9780938315025. 
  28. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag Templat:NETransit
  29. ^ Templat:Dorin-Commuter
  30. ^ Carr, Robert (July 29, 1965). "MBTA Buys Old Colony Line For a South Shore Express". Boston Globe – via Newspapers.com. 
  31. ^ Drury, George H. (1994). The Historical Guide to North American Railroads: Histories, Figures, and Features of more than 160 Railroads Abandoned or Merged since 1930. Waukesha, Wisconsin: Kalmbach Publishing. hlm. 222–229, 248. ISBN 0-89024-072-8. 
  32. ^ Sanders, Craig (2006). Amtrak in the Heartland. Bloomington, Indiana: Indiana University Press. hlm. 19–21. ISBN 0-253-34705-X. 
  33. ^ a b c Hartley, Scott (1989). Guilford: Five Years of Change. Railpace Company. hlm. 6, 12, 13, 89–91. ISBN 0-9621541-1-3. 
  34. ^ 1977 Annual Report. Massachusetts Bay Transportation Authority. 1977. hlm. 15 – via Internet Archive. 
  35. ^ Langner, Paul (January 23, 1984). "What's in store for B&M riders". Boston Globe. hlm. 17, 18 – via Newspapers.com. 
  36. ^ Crocket, Douglas S. (April 21, 1985). "T rail service resumes at North Station". Boston Globe. hlm. 29, 30 – via Newspapers.com. 
  37. ^ Rosenberg, Ronald (July 30, 1990). "Starts and Stops: Old Colony line inspires a petition duel". Boston Globe. hlm. 18 – via Newspapers.com.  publikasi akses terbuka - bebas untuk dibuka
  38. ^ Iudica, Doreen E. (August 2, 1992). "Advocates push for train access". Boston Globe – via Newspapers.com. (second page) publikasi akses terbuka - bebas untuk dibuka
  39. ^ a b c Ackerman, Jerry (March 8, 1989). "T pressured to open all routes to disabled". Boston Globe. hlm. 1, 16 – via Newspapers.com.  (second page, third page) publikasi akses terbuka - bebas untuk dibuka
  40. ^ "Another day, another $100". Boston Globe. May 22, 1989. hlm. 20 – via Newspapers.com.  publikasi akses terbuka - bebas untuk dibuka
  41. ^ Richard, Ray (September 16, 1985). "North Shore bridge job "on target"". Boston Globe. hlm. 17, 20 – via Newspapers.com.  publikasi akses terbuka - bebas untuk dibuka
  42. ^ MBTA : ACCESS; The Guide to Accessible Services and Facilities. Massachusetts Bay Transportation Authority. June 1992. hlm. 14, 15 – via Internet Archive. 
  43. ^ United States Environmental Protection Agency (October 4, 1994). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts—Amendment to Massachusetts' SIP (for Ozone and for Carbon Monoxide) for Transit Systems Improvements and High Occupancy Vehicle Facilities in the Metropolitan Boston Air Pollution Control District)". Federal Register. 59 FR 50498. 
  44. ^ Palmer, Thomas C., Jr. (March 9, 1998). "On drinking and driving: many studies, but little consensus". Boston Globe – via Newspapers.com. 
  45. ^ "MBTA Exercises Option With MBCR For Commuter Rail Service, Launches New Customer-Focused Improvements". MBTA. January 6, 2010. Diarsipkan dari versi asli tanggal October 9, 2010. Diakses tanggal January 7, 2010. MBTA extends MBCR contract another two years. 
  46. ^ Commuter Rail Firm Gets Contract Extension Diarsipkan 2012-10-25 di Wayback Machine. Boston.com, accessed February 16, 2010.
  47. ^ Boston Metro, June 6, 2008, p. 2.
  48. ^ Salsberg, Bob (January 7, 2012). "MBTA nixes commuter rail takeover". Worcester Telegram. Diakses tanggal March 2, 2023. 
  49. ^ http://www.mbta.com/about_the_mbta/news_events/?id=6442451214&month=1&year=14 Diarsipkan 2016-03-03 di Wayback Machine. MBTA press release on Keolis Commuter Services award
  50. ^ "Keolis loses millions of dollars on its MBTA contract". Trains Magazine. February 22, 2016. Diarsipkan dari versi asli tanggal February 25, 2016. Diakses tanggal February 23, 2016.  (perlu berlangganan)
  51. ^ Vaccaro, Adam (June 15, 2020). "MBTA extends Keolis contract through at least 2025". Boston Globe. Diarsipkan dari versi asli tanggal June 15, 2020. Diakses tanggal June 15, 2020. 
  52. ^ Cox, John (January 28, 2008). "Wi-Fi trial Connects Massachusetts Train Passengers". PC World. Diarsipkan dari versi asli tanggal January 10, 2015. Diakses tanggal January 9, 2015. 
  53. ^ "Free Wi-Fi Service Expanded" (Siaran pers). Massachusetts Bay Transportation Authority. December 19, 2008. 
  54. ^ Thadani, Trisha (July 24, 2014). "MBTA to boost Web service on commuter rail". The Boston Globe. Diarsipkan dari versi asli tanggal July 30, 2014. Diakses tanggal January 10, 2014. 
  55. ^ "New WiFi System for Commuter Rail" (Siaran pers). Massachusetts Bay Transportation Authority. July 24, 2014. Diarsipkan dari versi asli tanggal February 3, 2015. Diakses tanggal May 11, 2015. 
  56. ^ Seiffert, Don (August 10, 2017). "MBTA nixes $140M plan to upgrade Wi-Fi on commuter rail". Boston Business Journal. Diarsipkan dari versi asli tanggal November 26, 2017. Diakses tanggal November 26, 2017. 
  57. ^ Poftak, Steve (July 31, 2017). "MBTA Wi-Fi Project Update" (PDF). Massachusetts Bay Transportation Authority. 
  58. ^ "Report from the General Manager" (PDF). Massachusetts Bay Transportation Authority. January 11, 2021. hlm. 36. 
  59. ^ "Lt. Governor: Historic CSX Rail Agreement". Commonwealth Conversations: Transportation. Massachusetts Department of Transportation. September 23, 2012. Diarsipkan dari versi asli tanggal March 6, 2013. Diakses tanggal December 24, 2012. 
  60. ^ Monahan, John J. (October 4, 2012). "At CSX freight yard, Murray touts increased train service". Worcester Telegram & Gazette. Diarsipkan dari versi asli tanggal October 10, 2012. Diakses tanggal December 24, 2012. 
  61. ^ "Fairmount Line Improvements". Massachusetts Bay Transportation Authority. Diarsipkan dari versi asli tanggal January 29, 2013. Diakses tanggal December 11, 2011. 
  62. ^ Rocheleau, Matt (November 12, 2012). "MBTA opens new commuter rail station at Talbot Avenue in Dorchester on Fairmount Line". Boston Globe. Diarsipkan dari versi asli tanggal March 4, 2016. Diakses tanggal November 12, 2012. 
  63. ^ "Boston to T.F. Green rail service debuts". NBC 10 News. December 6, 2010. Diarsipkan dari versi asli tanggal February 5, 2013. Diakses tanggal August 1, 2011. 
  64. ^ "FITCHBURG LINE Schedule effective September 30, 2016" (PDF). Massachusetts Bay Transportation Authority. September 30, 2016. Diarsipkan dari versi asli (PDF) tanggal September 26, 2016. 
  65. ^ "MBTA Announces Schedule Revisions to Take Effect Tuesday, March 17" (Siaran pers). Massachusetts Bay Transportation Authority. March 16, 2020. Diarsipkan dari versi asli tanggal 2020-06-12. Diakses tanggal 2020-06-16. 
  66. ^ "Report from the Deputy General Manager" (PDF). Massachusetts Bay Transportation Authority. June 15, 2020. Diarsipkan dari versi asli (PDF) tanggal 2020-06-17. Diakses tanggal 2020-06-16. 
  67. ^ DiAdamo, Rob (September 14, 2020). "Fall 2020 Commuter Rail Schedule Changes" (PDF). Massachusetts Bay Transportation Authority. Diarsipkan dari versi asli (PDF) tanggal 2020-10-20. Diakses tanggal 2020-09-14. 
  68. ^ Paget-Seekins, Laurel; Benesh, Kat (November 9, 2020). "Forging Ahead: Scenario and Service Planning" (PDF). Massachusetts Bay Transportation Authority. hlm. 21. Diarsipkan dari versi asli (PDF) tanggal 2021-05-11. Diakses tanggal 2021-06-03. 
  69. ^ Enwemeka, Zeninjor (December 14, 2020). "MBTA Control Board Votes To Scale Back Bus, Train And Ferry Service". WBUR. Diarsipkan dari versi asli tanggal January 26, 2021. Diakses tanggal February 5, 2021. 
  70. ^ Paget-Seekins, Laurel; Benesh, Kat (December 14, 2020). "Forging Ahead: Service Proposal" (PDF). Massachusetts Bay Transportation Authority. hlm. 17. Diarsipkan dari versi asli (PDF) tanggal 2021-04-29. Diakses tanggal 2021-06-03. 
  71. ^ "Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Siaran pers). Massachusetts Bay Transportation Authority. December 10, 2021. Diarsipkan dari versi asli tanggal 2021-06-11. Diakses tanggal 2021-06-03. 
  72. ^ "Commuter Rail Schedule Changes Approved in December Take Effect January 23" (Siaran pers). Massachusetts Bay Transportation Authority. January 7, 2021. Diarsipkan dari versi asli tanggal 2021-06-26. Diakses tanggal 2021-06-03. 
  73. ^ "Reminder: Spring 2021 Commuter Rail Schedules Take Effect April 5" (Siaran pers). Keolis Commuter Services. April 1, 2021. Diarsipkan dari versi asli tanggal June 3, 2021. Diakses tanggal June 3, 2021. 
  74. ^ Coholan, Ryan (May 24, 2021). "Commuter Rail Performance Update" (PDF). Massachusetts Bay Transportation Authority. hlm. 7. Diarsipkan dari versi asli (PDF) tanggal 2021-05-24. Diakses tanggal 2021-06-03. 
  75. ^ "PUBLIC TRANSPORTATION RIDERSHIP REPORT First Quarter 2021" (PDF). APTA Ridership Report. June 1, 2021. 
  76. ^ "PUBLIC TRANSPORTATION RIDERSHIP REPORT First Quarter 2022" (PDF). APTA Ridership Report. June 16, 2022. 
  77. ^ Bessette, James (July 1, 2016). "All aboard! Seaview Transportation Company rides the rails to success". South County Independent (dalam bahasa Inggris). Diarsipkan dari versi asli tanggal February 17, 2022. Diakses tanggal October 14, 2022. 
  78. ^ "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. hlm. 70. 
  79. ^ "Allston Multimodal Project Fact Sheet". Massachusetts Department of Transportation. 2021. 
  80. ^ Henderson, Richard (December 15, 2022). "Widett Circle Acquisition" (PDF). Massachusetts Bay Transportation Authority. 
  81. ^ "MBTA Seeks to Purchase Widett Circle Property for Commuter Rail Layover Yard" (Siaran pers). Massachusetts Bay Transportation Authority. December 15, 2022. 
  82. ^ "Executive Summary" (PDF). South Side Maintenance and Layover Facility EENF. Massachusetts Bay Transportation Authority. November 2022. 
  83. ^ Finucane, Martin (February 7, 2011). "MBTA unveils first new locomotive in 23 years". The Boston Globe. Diarsipkan dari versi asli tanggal February 16, 2012. 
  84. ^ "Wachusett Mountain". Massachusetts Bay Transportation Authority. 
  85. ^ a b "FMCB Approves the Procurement of 80 New Commuter Rail Bi-Level Coaches" (Siaran pers). Massachusetts Bay Transportation Authority. September 23, 2019. 
  86. ^ Poftak, Steve (June 23, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. hlm. 11. 
  87. ^ a b c d Middleton, William D. (November 1991). "How MBTA rebuilt ridership". Railway Age. Diarsipkan dari versi asli tanggal May 22, 2009. Diakses tanggal August 3, 2008. 
  88. ^ Leung, Shirley (September 6, 2013). "State to begin innovative rail service between Seaport District and Back Bay". Boston Globe. Diarsipkan dari versi asli tanggal February 21, 2020. Diakses tanggal September 6, 2013. 
  89. ^ Stout, Matt (June 20, 2015). "Charlie Baker derails T trains". Boston Herald. Diarsipkan dari versi asli tanggal July 27, 2015. 
  90. ^ Sawers, Alistair (April 12, 2021). "Regional Rail Transformation Update: EMU Pilot and Phase 1 Planning Update" (PDF). Massachusetts Bay Transportation Authority. Diarsipkan dari versi asli (PDF) tanggal 2021-04-12. Diakses tanggal 2021-04-12. 
  91. ^ "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. hlm. 46, 68, 96, 111. 
  92. ^ Bruce Mohl (April 25, 2022). "Keeping score on MBTA control board's priorities". CommonWealth. 
  93. ^ Sawers, Alistar (June 23, 2022). "Regional Rail Transformation Update: Traction Power Planning for Regional and Urban Rail Services" (PDF). Massachusetts Bay Transportation Authority. 
  94. ^ "Millions For Worcester Transportation Upgrades In State Bond Bill". Worcester, MA Patch (dalam bahasa Inggris). August 3, 222. Diakses tanggal August 12, 2022. 
  95. ^ "Could the New Governor Breathe New Life Into the T's Regional Rail Plans?". StreetsblogMASS (dalam bahasa Inggris). 2022-11-29. Diakses tanggal 2022-11-30. 
  96. ^ Mohl, Bruce (2022-06-23). "MBTA outlines hybrid approach on rail electrification". CommonWealth Magazine (dalam bahasa Inggris). Diakses tanggal 2022-11-30. 
  97. ^ "North South Rail Link Feasibility Reassessment" (PDF). MassDOT. June 2018. Diarsipkan dari versi asli (PDF) tanggal 2019-11-30. Diakses tanggal 2021-04-12. 
  98. ^ Laidler, John (June 16, 2017). "Sharp differences over latest plan for South Coast Rail". Boston Globe. Diarsipkan dari versi asli tanggal June 18, 2017. Diakses tanggal June 18, 2017. 
  99. ^ Humphrey, Thomas J. (March 1997). Bourne Commuter Rail Feasibility Study. Central Transportation Planning Staff. 
  100. ^ Humphrey, Thomas J. (January 2007). Buzzards Bay Commuter Rail Extension Feasibility Study. Central Transportation Planning Staff. 
  101. ^ Vaccaro, Adam (February 15, 2016). "This Cape Cod town is paying for rail service that doesn't exist". Boston Globe. Diarsipkan dari versi asli tanggal February 16, 2016. 
  102. ^ Rausch, Michael J. (February 26, 2016). "Details Expected Soon About Buzzards Bay Commuter Trains". Cape News. Diarsipkan dari versi asli tanggal November 30, 2019. 
  103. ^ Mohl, Bruce (April 4, 2016). "T approves N. Quincy real estate deal: Rejects test of daily commuter service to Cape Cod". Commonwealth Magazine. Diakses tanggal December 29, 2022. 
  104. ^ VHB/HNTB (January 31, 2018). "Chapter 2 – Alternatives Analysis". South Coast Rail Draft Supplemental Environmental Impact Report. Massachusetts Department of Transportation. 
  105. ^ "Cape Rail Study" (PDF). Cape Cod Commission. September 2021. hlm. ES-3. 
  106. ^ Rich-Kern, Sheryl (February 26, 2013). "A New Push For Commuter Rail". New Hampshire Public Radio. Diarsipkan dari versi asli tanggal March 4, 2013. 
  107. ^ Kitch, Michael (December 22, 2020). "New Hampshire Executive Council OKs start of Capitol Corridor design". New Hampshire Business Review. Diarsipkan dari versi asli tanggal December 28, 2020. 
  108. ^ "New Hampshire Capitol Corridor Rail and Transit Alternatives Analysis". New Hampshire Department of Transportation. December 2014. 
  109. ^ "Nashua - Manchester 40818 | Project Specific Information | Project Center | NH Department of Transportation". www.nh.gov. Diakses tanggal 2023-03-12. 
  110. ^ Edwards and Kelcey, Inc (July 2001). "South County Commuter Rail Service Plan" (PDF). Rhode Island Department of Transportation. Diarsipkan dari versi asli (PDF) tanggal April 16, 2009. 
  111. ^ "Feasibility Study for Intercity Rail Service to T.F. Green Airport" (PDF). Amtrak and the Rhode Island Department of Transportation. April 2017. 
  112. ^ a b Humphrey, Thomas J. (July 1997). Milford Commuter Rail Extension Feasibility Study. Central Transportation Planning Staff. 
  113. ^ Jacobs Edwards and Kelcey (2007). "Commuter Rail Feasibility Study" (PDF). City of Woonsocket. Diarsipkan dari versi asli (PDF) tanggal April 2, 2015. 
  114. ^ Humphrey, Thomas J. (March 1998). Millis Commuter Rail Extension Feasibility Study. Central Transportation Planning Staff. 
  115. ^ a b Stone & Webster (January 1990). Commuter Rail Extension Feasibility Study: Framingham to Worcester, Milford & Marlborough. Massachusetts Bay Transportation Authority. 
  116. ^ Humphrey, Thomas J. (April 2002). I-290/ Northborough Commuter Rail Extension Feasibility Study. Central Transportation Planning Staff. 
  117. ^ Grand Junction Transportation Feasibility Study. Central Transportation Planning Staff. July 2012. 
  118. ^ Humphrey, Thomas J. (December 1996). Central Mass Commuter Rail Feasibility Study. Central Transportation Planning Staff. 
  119. ^ Vollmer Associates (1985). M.B.T.A. Lexington Branch Railroad Right-of-Way Study. Massachusetts Bay Transportation Authority. 
  120. ^ McMahon Associates (February 2005). "Fitchburg Commuter Rail Line Service Expansion Study" (PDF). Massachusetts Bay Transportation Authority. hlm. 27–28. Diarsipkan dari versi asli (PDF) tanggal March 18, 2006. 
  121. ^ "Plaistow Commuter Rail Extension Study". New Hampshire Department of Transportation. March 2015. 
  122. ^ "Hampton Branch Commuter Rail Feasibility Study" (PDF). Seacoast Metropolitan Planning Organization. June 30, 1999. Diarsipkan dari versi asli (PDF) tanggal July 18, 2004. 
  123. ^ PB/DMJM+HARRIS, Joint Venture (March 2004). "North Shore Transit Improvements Project Major Investment Study". Massachusetts Bay Transportation Authority. Diarsipkan dari versi asli tanggal February 26, 2010. 
  124. ^ Annear, Steve (January 9, 2014). "Take A Ride On The MBTA's "New Indigo Line" In 2024". Boston Magazine. Diarsipkan dari versi asli tanggal October 23, 2017. 
  125. ^ "South Salem Stop: Conceptual Design Update" (PDF). The Salem Partnership. November 14, 2016. 

Pranala luar[sunting | sunting sumber]

KML is from Wikidata

Templat:MBTA Templat:Keolis Templat:Northeast Corridor navbox Templat:USCommRail